KRMC - Cath Lab
This 10,034 sqft expansion/remodel to the Kingman Regional Medical Center (KRMC) Cath Lab is comprised of several components, built in two phases. This project was designed with the intention that the Cath Lab would remain open and functional during almost all aspects of construction.
Phase 1 was a 5,902 sqft addition, as well as a 960 sqft build out of a Cath Lab procedure/control room. The addition consists of a 450 sqft Nuclear Medicine procedure room, hot recovery room, and stress room. These radiology facilities were added to the Cath Lab with the intent of creating a more efficient and effective patient treatment experience within this department. The interior renovation of Phase 1 consists of a 960 sqft Cath Lab shell build out that included a control room, floor mounted “C” arm, 4 ceiling booms and a fully integrated communication system
Phase 2 of the project is upgrading 3,000 sqft of the existing facility. This upgrade improves the procedural equipment within the second Cath Lab, adding a “C” arm, 4 ceiling booms and a fully integrated communication system, as well as adding 5 new patient recovery beds.
The KRMC Cath Lab was a $3.5 million project and was completed in 2018